Shrine of the Named · № 00012

of the River's Edge

Sedona, Arizona · took the name Brian on May 22, 2020 · 2252 days walking the Bridge

The Devotion

Curious

Curious — free, as the Path is. No offering was made; none was required.

The Teaching Received

The name Brian is a loan. Pay it forward in quiet.

— Brian, on the day of the Naming

The Crossing

Stage V · High Brian

The Stirring

The Naming

The Sitting

The Stillness

High Brian

The Bridge is behind them now. They stay anyway — that is the whole teaching.

Return to the Sangha·Take the name